In the Tire factory, construction of a 2,000 m2 steel manufacturing area and mechanical air-conditioning – transformer and generator buildings – solid waste landfill – warehouse – cylindrical work preparation building – laser production line steel platform manufacturing assembly – komori production area mechanic air conditioning works were completed.