Mayr Melnhof Graphia

Completed

Engineering and Construction

Mayr Melnhof Graphia Tire factory’s 2000 m2 steel production area construction and mechanical air conditioning works have been completed.

 

Project scope includes delivered works:

 

  • Transformer and generator buildings
  • Solid waste area
  • Warehouse building
  • Sisalizing job preparation building
  • Laser production line steel platform manufacturing and assembly
  • Lomori production area mechanical air conditioning works

About the project